Building

About the Building

  • Year of construction 2024
  • Restaurant on ground floor
  • Apartments on 1st to 5th floor
  • Pool and roof terrace on 6th floor
  • Parking lots in the Basement
  • Elevator from basement to the roof
  • Triple glazing on all windows (good sound insulation)
  • Separate entrance to apartments and restaurant
Scroll to top